top of page

39 - Bling and the last few jobs


January 2019. And the car is now mechanically and electrically complete. It will now drive !

The last jobs are now being crossed off.

A scabby old hub cap is going to be used to make a cap for the front wheel.

After a great deal of straightening and cleaning a central hole is cut to accommodate the front stub.

And on it goes !

The number plates are fitted using black plastic fittings.

The heater hot air hoses are fitted. This was a fiddly job as the connections for the heater matrix are well hidden beneath the cover. It was necessary to enlarge the holes slightly & drill a couple of observation holes.

bottom of page